News
Drainage Construction: Warri/Sapele Road Temporarily Barricaded
By Ambrose Ologide
The ever busy Ogbe -Ijoh market portion of Warri / Sapele Road has temporarily been barricaded due to the ongoing massive drainage construction project that cuts across the road at as the time of filing this report.
Vehicles from the NPA axis of the road cannot pass through the said portion to the Warri Garage axis.
ALSO READ: Shettima: PDP Tasks Buhari, FG To Speak Out On Public Holiday Allegation
Desperate passengers were compelled to trek a short distance to either sides to board waiting commercial tricycles ( keke ) to their destinations.
However this was not the case of commercial ( kpelegbe ) bus drivers that navigated through the axial routes of Robert, Swamp Mission and GRA roads.
Those who spoke to our correspondent, commended the Delta State Government for the drainage projects.
They noted that the project, when completed will reduce the flooding problem in Warri .
However, some of the respondents complained that the project has impeded vehicular movements in the area .
One of them, Madam Juan Onose noted that the area was one of the commercial hubs in Warri with the location of commercial banks and two major markets, Ogbe – Ijoh ( popularly called iron or sand sand ) Market and Main Market.
She therefore appealed that the contractor handling the project should be fast on it .
It was observed that makeshifts stalls in the age long market of Sand Sand ( Iron ) market construction were demolished to make way for the drainage project .
-
News19 hours agoOborevwori’s Achievements Have Put His Distractors To Shame – Erute
-
News13 hours agoOborevwori Felicitates Akpowowo At 53
-
Education13 hours agoDafinone Partners Scholara To Expand Access To Technology-Driven Learning For Students In Delta Central
-
Column1 hour agoIs Iran’s Second Liberation Afoot?
-
News39 minutes agoAt 56, Festus Keyamo Exemplifies Courageous Service To Nigeria — Dafinone
