Church Gists
32 Transformers To Power The Ark – Bishop Oyedepo Reveals
Bishop David Oyedepo has announced that The Ark, the massive new worship center at Canaanland, will be powered by 32 transformers to meet its huge electricity demand.
The facility is expected to be fully operational after its dedication in November 2025.
Speaking during a church service at Faith Tabernacle, the Bishop explained that the power requirement stems from features such as 129 elevators, escalators, and travelators designed to move worshippers—including the elderly and physically challenged—across the four-level, 109,000-seat main auditorium, the 5,000-capacity youth church, and a 20,000-seat children’s church.
The Ark also houses 12 twin-tower mission headquarters buildings, where staff movement will largely depend on lifts rather than staircases.
ALSO READ: BREAKING: President Tinubu Changes Service Chiefs
Although Canaanland’s existing 15MW power plant, installed in 2016, has kept the estate running without a single blackout since 1999, it will not be sufficient for The Ark. A new 80MW power plant, already under construction, will power The Ark and extend supply to Covenant University, Canaan City, and potentially parts of Ota.
Additionally, The Ark will tap into 1MW of solar energy, while its roof will harvest rainwater for flushing over 1,200 restrooms using gravity-based systems.
Bishop Oyedepo emphasized that Canaanland has never experienced a full blackout in over two decades, defying the nationwide power crisis.
-
Education17 hours agoFacebook User Slams SDU Over Dissolution Of SUG, Alleges Threat To Student Democracy
-
Politics10 hours ago2027 Governorship: ADC Urges Deltans To Back Ogboru, Rescue State
-
Education15 hours agoDelta NUT Hails Oborevwori Over Career Progression For Graduate Primary School Teachers
-
News8 hours agoFCTA To Build More Bus Terminals, Eliminate Illegal Parks
-
News25 minutes agoThe Disconnect That Could Cost The APC In 2027 – Group Raises Alarm
