News
FG Transfers Operations Of Largest Hydroelectric Power Plant In Nigeria To Penstock Limited

The Federal Government has officially transferred the operations of the Zungeru Hydroelectric Power Plant to Penstock Limited.
This move is expected to “boost Nigeria’s power generation capacity and contribute significantly to meeting the country’s growing energy demands.
The Concession Agreement was signed on December 13, 2023, by the Bureau of Public Enterprises (BPE) and Penstock Limited.
Following the Council approval, the Concessionaire fulfilled its obligation by paying 50% of the commencement fees on January 5, 2024.
ALSO READ: EFCC, NUPENG Join Forces Against Oil Theft
The 740MW Zungeru power facility located at the upper and middle reaches of River Kaduna in Niger State is the largest hydropower project in Nigeria.
The facility is expected to produce 2.64bn kWh of electricity annually and meet around 10% of Nigeria’s total domestic energy requirements.
The Zungeru hydropower project will provide power generation, flood protection, and water for irrigation. The project includes a roller-concrete compacted dam, an intake tower and diversion tunnel, an underground powerhouse, a power transmission line, and an access road.
The project is expected to provide employment opportunities to more than 2,000 people during the peak construction period.
-
News20 hours ago
BREAKING: Tinubu Reconstitutes NNPC Limited Board, Appoints New Chairman, Group CEO
-
Politics19 hours ago
APC Isoko Nation Leaders Endorse Senator Joel-Onowakpo Thomas For Second term
-
News15 hours ago
Oborevwori Congratulates Olu Of Warri At 41
-
News9 hours ago
Emetulu Congratulates Avuru On His Appointment Into NNPCL Board
-
Crime14 hours ago
DELSU VC Raises Alarm Over Scammers Using His Identity, Name On Facebook