News
FG Transfers Operations Of Largest Hydroelectric Power Plant In Nigeria To Penstock Limited

The Federal Government has officially transferred the operations of the Zungeru Hydroelectric Power Plant to Penstock Limited.
This move is expected to “boost Nigeria’s power generation capacity and contribute significantly to meeting the country’s growing energy demands.
The Concession Agreement was signed on December 13, 2023, by the Bureau of Public Enterprises (BPE) and Penstock Limited.
Following the Council approval, the Concessionaire fulfilled its obligation by paying 50% of the commencement fees on January 5, 2024.
ALSO READ: EFCC, NUPENG Join Forces Against Oil Theft
The 740MW Zungeru power facility located at the upper and middle reaches of River Kaduna in Niger State is the largest hydropower project in Nigeria.
The facility is expected to produce 2.64bn kWh of electricity annually and meet around 10% of Nigeria’s total domestic energy requirements.
The Zungeru hydropower project will provide power generation, flood protection, and water for irrigation. The project includes a roller-concrete compacted dam, an intake tower and diversion tunnel, an underground powerhouse, a power transmission line, and an access road.
The project is expected to provide employment opportunities to more than 2,000 people during the peak construction period.
-
News13 hours ago
Ughelli North APC Chairman, Others Suspended, Replaced By Evwighono, Others
-
Politics12 hours ago
Ughelli South United Forum Endorses Tinubu, Oborevwori For Second Term
-
Feature42 minutes ago
My Good Dream For Anioma People – Senator Ned Nwoko
-
News27 minutes ago
Governor Soludo Congratulates Rt. Hon. Somtochukwu Udeze On His Birthday
-
News8 minutes ago
Sapele LGA Gives Guidelines To Okada, Keke Operators