News
Third Mainland Bridge To Be Reopened Sunday Midnight
The Federal Controller of Works, Lagos, Mr Olukayode Popoola, on Sunday said the total shutdown of the Third Mainland Bridge would be lifted at midnight of Jan. 31, 24 hours ahead of schedule.
Popoola told the News Agency of Nigeria (NAN) the contractor was able to complete the repair works on the bridge on Saturday, hence the lifting of the total closure at midnight.
“The casting of the expansion joints was completed on Saturday. Therefore, the Third Mainland Bridge will be opened by 12 midnight of Jan. 31.
“Motorists can start plying the bridge as from 12 midnight,” he said.
ALSO READ : CDHR: Indefinite Suspension Of National President Stands, NC Virtual Meeting Illegal, Says General Secretary
While thanking road users for their understanding, Popoola said that the reopening had been communicated to the Lagos State government and all relevant agencies to ensure seamless traffic on the highway.
Popoola had, on Jan. 27, announced a three-day total shutdown of the bridge from the midnight of Friday to midnight of Monday, Feb. 1 to allow for replacement of three expansion joints.
The bridge, which is going through series of repairs, was partially shut on July 24, 2020 for another round of rehabilitation works.
The repair, expected to last six months, was extended by one month due to the #EndSARS protests in Lagos, thus extending the completion date from January to February.
The construction was initially divided into two phases of three months on each carriageway, starting with the Oworonsoki-bound carriageway whose completion dragged to four months.
Traffic was partially diverted on a stretch of 3.5 kilometres where construction is ongoing between Adeniji Adeniji ramp and Ebute-Meta, while different time belts were allotted for traffic diversions on the bridge.
The 11.8-kilometre bridge is the longest of the three bridges connecting Lagos Island to the Mainland.
The bridge starts from Oworonshoki, which is linked to the Apapa-Oshodi expressway and the Lagos-Ibadan expressway and ends at the Adeniji Adele interchange on Lagos Island.
Constructed in 1990, the bridge was adjudged the longest in Africa until 1996 when the Oct. 6 Bridge in Cairo, Egypt, was completed.
NAN
-
World News17 hours ago
BREAKING: British Police, Courts Prove Dependable In Quick Resolution Of Frozen Funds Case
-
News17 hours ago
FG To Digitize Headquarters Of 774 LGAs By 2027
-
News16 hours ago
End Cult Clashes In Edo Within 48 Hours- Gov Okpebholo Tells Police Commissioner
-
News8 hours ago
Government In Defence Of Crime
-
Feature4 hours ago
Teachers’ Promotion Arrears: Delta SUBEB, Cesspool Of Corruption, Needs Urgent Probe